You don't have javascript enabled. Good luck with that.
Pencarian
Sisi Selatan Saluran Jl Akses Marunda Diturap

Damaged Sheet Piles on Marunda Access Road Repaired

River stone material is stronger to withstand vibrations from passing heavy vehicles

North Jakarta Water Resources (SDA) Sub-agency repairs sheet piles on the south side of Marunda access road, Semper Timur, Cilincing up to 120 meters long.

Cilincing Sub-district SDA Executing Unit Head Cahyono Budi Setiawan said it was carried out by re-developing the damaged sheet pile parts using river stone material.

Mud Dredging in Baru Barat River Appreciated by Locals

"River stone material is stronger to withstand vibrations from passing heavy vehicles," he expressed, Friday (10/9).

His side also demolished an inrit at the same location by involving 20 personnel plus some equipments and four trucks.

"This work is one of the realized musrenbang proposals," he stated.

Linked News
Popular News indeks
  1. City Council Strengthens Synergy with Central Legislators to Support Jakarta`s Development

    access_time30-07-2026 remove_red_eye1076 personFakhrizal Fakhri
  2. Jakarta Partners with Five Satellite Cities for Greater Jakarta Connected Initiative

    access_time30-07-2026 remove_red_eye601 personBudhi Firmansyah Surapati
  3. Pramono Praises Young Innovators at the Jakarta Robotic Games 2026

    access_time28-07-2026 remove_red_eye488 personDessy Suciati
  4. Jakarta Reaffirms Commitment to Preserving Cultural Heritage

    access_time31-07-2026 remove_red_eye485 personDessy Suciati
  5. Various Events Prepared for Jakarta`s 5th Century Anniversary

    access_time29-07-2026 remove_red_eye472 personFakhrizal Fakhri